Mini map
image
see layout of the complex
Objects >>

Galvanization and heat treatment workshop

Stotal=633,1 m2

Description

Galvanization and heat treatment workshop is currently acting production line equipped with all necessary equipment and infrastructure required for supporting its production activity.

Both production sectors of galvanization and the sector of heat treatment might be considered as separate areas or a single production line.

 


 

Workshop infrastructure

  • Water supply system including water recycling system for industrial needs, has its own cooling tower
  • Electricity supply
  • Heating system
  • Sewerage
  • Exhaust ventilation
  • Compressed air
  • Lifting mechanisms around the perimeter of the building: crane beams, jib-cranes
  • Possibility of expanding production space through the attachment of neighbouring premises
Heat treatment sector

 



Purpose

The main activity of the workshop section is full range of heat treatment operations for any sorts of metal parts with different size and length. Located on the first floor of the building, equipped with special gates and lifting mechanisms for loading & unloading operations. 

 

Major activities

  • Tempering
  • Heat treatment of large-size parts
  • Heat treatment of small-size parts
  • Surface hardening by high frequency currents
  • High temperature treatment of  high-speed steels for cutting tools production

 

Zones

 

Horizontal furnaces – area suitable for treatment of small-size parts

Vertical furnaces – shaft-furnace area suitable for heat treatment of large capacity workpieces, or sizeable workpieces

High-frequency current plant – metal surface hardening  area     

 

Equipment 

Download treatment equipment list  

 



Galvanization sector



 



Purpose

Galvanization processing facility suitable for covering of metal items with additional layer of metal (zinc and chrome plating, gilding, silvering, etc.) in decorative purposes and for protection from corrosion. 


Major activities

  • Chrome plating
  • Zinc plating
  • Chemical oxidation
  • Electro-chemical polishing
  • Industrial  etching

 

Equipment 

Download galvanization equipment list  











 





 

 

 

Purpose
The main activity of the workshop section is full range of heat treatment operations for any sorts of metal parts with different size and length. Located on the first floor of the building, equipped with special gates and lifting mechanisms for loading & unloading operations. 
Major activities
· Tempering
· Heat treatment of large-size parts
· Heat treatment of small-size parts
· Surface hardening by high frequency currents
· High temperature treatment of  high-speed steels for cutting tools production
 
Zones
Horizontal furnaces – area suitable for treatment of small-size parts
Vertical furnaces – shaft-furnace area suitable for heat treatment of large capacity workpieces, or sizeable workpieces
High-frequency current plant – metal surface hardening  area     
Equipment 

 

 

 

 

 

Objects
Services